4/16/2013

Welcome Back Group Meeting 15/04

Now that we are all back for Easter, we all got together and discussed what we did for Easter and what needs to be done over the next week. Critiques were given to the models that have been created to help better them for the final product but more importantly, to do lists were given to each individual team member as we feel like a few set backs with terrain has held us back from building the level in engine.

From the Critiques given these are the assignments given to the Team members:

  • Jamie    -  Normals for the Stall and Modulars need to be completed.
                   The sides of the buildings need to go back further to fake the feeling of alleyways.
  • Anna    -  The beams for the shop front buildings need thickening.
                    Chimeneys need making for the modulars that were completed previously.
                    The drying rack for nets will be finished and textured.
  • Ewa     -  Windows need varying more as they look too similar.
                   Wooden steps need muddying up as they look un-used.
                    Re-topping the cloth for the stall is crucial as the tri count is way too high. 
  • George -  Door variants need finishing.
                    Modular speculars need making and cobblers needs completing.
  • Shay    -   Create and texture the interior of the tavern.
                    Update the Team design document and all documentation for the team blog.
                    Weeds and trees need recreating as they were lost yesterday.
                     Make Backups!
  • Michael -  Create Terrain.
                     Fix the Terrain textures as they are too green and 'pretty' and import into engine.
                     Overall level needs building. 
After talking for a long time, Team leader Anna has stressed that "we are not leaving the labs till we have some kind of level built". So go team go. 

  - Shayleen 